As of 17 November 2026, DC Info lists 5 data centre projects in Western Australia (1 under construction, 2 planning, 2 operational / expansion). 4 of 5 projects publish a capacity figure in MW, together about 1.18 GW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 28 data centre facilities in Western Australia, run by 17 operators.
Largest WA data centre projects by published capacity
| Project | Owner / operator | Location | Stage | Capacity |
|---|---|---|---|---|
| Project Meridien | Gingerah Energy consortium | South of Broome | Planning | Up to 1 GW IT load |
| CDC Maddington campus | CDC Data Centres | Maddington | Under construction | 150 MW IT load |
| NEXTDC P2 Perth | NEXTDC | East Perth | Operational / expansion | 20+ MW IT load |
| NEXTDC P1 Perth – Stage Two | NEXTDC | Malaga | Operational / expansion | 10+ MW IT load |
Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.
All 5 projects in Western Australia
| Project | Owner / operator | Location | Stage | Capacity (as published, with basis) |
|---|---|---|---|---|
| CDC Maddington campus | CDC Data Centres | Maddington | Under construction | 150 MW IT load |
| CDC Hazelmere data centre | CDC Data Centres | Hazelmere | Planning | Not disclosed |
| Project Meridien | Gingerah Energy consortium | South of Broome | Planning | Up to 1 GW IT load |
| NEXTDC P1 Perth – Stage Two | NEXTDC | Malaga | Operational / expansion | 10+ MW IT load |
| NEXTDC P2 Perth | NEXTDC | East Perth | Operational / expansion | 20+ MW IT load |
Data centre facilities in Western Australia (28)
| Facility | Operator | Suburb / area | Type | Capacity (as published) |
|---|---|---|---|---|
| CMTG Morley | CMTG | Morley | Colocation | Not disclosed |
| QV.1 Data Centre | Central Data Systems | Perth | Colocation | Not disclosed |
| DC Alliance PIER Canning Vale | DC Alliance | Canning Vale | Colocation | Not disclosed |
| DC West DCW-Pier | DC West | Perth | Colocation | Not disclosed |
| Dataspace Malaga Data Centre | Dataspace | Malaga | Colocation | 10 MW IT load (3,500 m²) IT load |
| Equinix PE1 | Equinix | East Perth | Colocation | 464 m² colocation space |
| Equinix PE2 | Equinix | Shenton Park | Colocation | 1,170 m² colocation space |
| Equinix PE3 | Equinix | Perth | Colocation | Not disclosed |
| Geraldton Data Centre | Geraldton Data Centre | Geraldton | Colocation | Not disclosed |
| GlobalEdge Balcatta Data Centre | GlobalEdge | Balcatta | Colocation | Not disclosed |
| HostAway Malaga Data Centre | HostAway | Malaga | Colocation | Not disclosed |
| Metro Power Company West Perth | Metro Power Company | West Perth | Colocation | Not disclosed |
| NEXTDC NE1 Newman | NEXTDC | Newman | Edge | 1 MW IT capacity (560 m² technical space) IT load |
| NEXTDC P1 Perth | NEXTDC | Malaga | Colocation | 10 MW+ IT capacity (3,000 m² technical space) IT load |
| NEXTDC P2 Perth | NEXTDC | Perth | Colocation | 20 MW+ IT capacity (12,000 m² technical space) IT load |
| NEXTDC PH1 Port Hedland | NEXTDC | Port Hedland | Edge | 1 MW IT capacity (727 m² technical space) IT load |
| Pilot Energy Dongara Data Centre | Pilot Energy | Arrowsmith | — | Not disclosed |
| PureColo PER01 Perth | PureColo | Belmont | Colocation | 2 MW; up to 10 kW per rack Basis not stated |
| STACK PER01 Wangara | STACK Infrastructure | Wangara | Colocation | Not disclosed |
| Telstra InfraCo Wellington Data Centre | Telstra InfraCo | Wellington | Colocation | Not disclosed |
| Vocus Henderson Data Centre | Vocus | Munster | Colocation | Not disclosed |
| Vocus Murchison Terrace Data Centre | Vocus | Perth | Colocation | Not disclosed |
| Vocus Osborne Park Data Centre | Vocus | Osborne Park | Colocation | Not disclosed |
| Vocus PER01 Perth iX | Vocus | Perth | Colocation | Not disclosed |
| Vocus PER02 Watts Place | Vocus | Perth | Colocation | Not disclosed |
| Vocus PER03 Bennett Street | Vocus | Perth | Colocation | Not disclosed |
| Vocus St Georges Terrace Data Centre | Vocus | Perth | Colocation | Not disclosed |
| Zettagrid Bibra Lake | Zettagrid | Bibra Lake | Colocation | Not disclosed |
Data centre operators in Western Australia
Vocus (7), NEXTDC (4), Equinix (3), Central Data Systems (1), CMTG (1), Dataspace (1), DC Alliance (1), DC West (1), Geraldton Data Centre (1), GlobalEdge (1), HostAway (1), Metro Power Company (1), Pilot Energy (1), PureColo (1), STACK Infrastructure (1), Telstra InfraCo (1), Zettagrid (1)
Number of data centre facilities per operator in this state.
Other states and territories
- New South Wales (Sydney)
- Victoria (Melbourne)
- Queensland (Brisbane)
- Western Australia (Perth)
- South Australia (Adelaide)
- Australian Capital Territory (Canberra)
- Northern Territory (Darwin)
- Tasmania (Hobart)
Australian data centre pipeline summary → · Operators & owners →
Figures are generated from the DC Info directory (last updated 17 November 2026). Capacity is shown as published, with its basis. Coverage is not a complete census. Spotted a change? Let us know. See methodology.