DC Info

State guide · Updated 17 November 2026

Data Centres in the Northern Territory (Darwin)

As of 17 November 2026, DC Info lists 3 data centre projects in Northern Territory (1 under construction, 2 planning). 3 of 3 projects publish a capacity figure in MW, together about 3.01 GW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 4 data centre facilities in Northern Territory, run by 4 operators.

Search NT projects Search NT facilities

Largest NT data centre projects by published capacity

Largest NT data centre projects
ProjectOwner / operatorLocationStageCapacity
Beetaloo Digital Weddell precinctBeetaloo Digital (Beetaloo Energy Australia, ASX:BTL)WeddellPlanningUp to 2 GW Generation
Project Ares (Energy North)Energy NorthMurranji StationPlanning1 GW IT load
NEXTDC D2 DarwinNEXTDCDarwin CityUnder construction6+ MW IT load

Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.

All 3 projects in Northern Territory

NT data centre projects
ProjectOwner / operatorLocationStageCapacity (as published, with basis)
NEXTDC D2 DarwinNEXTDCDarwin CityUnder construction6+ MW IT load
Beetaloo Digital Weddell precinctBeetaloo Digital (Beetaloo Energy Australia, ASX:BTL)WeddellPlanningUp to 2 GW Generation
Project Ares (Energy North)Energy NorthMurranji StationPlanning1 GW IT load

Data centre facilities in Northern Territory (4)

Data centre facilities in NT
FacilityOperatorSuburb / areaTypeCapacity (as published)
Area9 Darwin Data CentreArea9DarwinColocationNot disclosed
DCI Darwin 01DCI Data CentersWishartColocationNot disclosed
DXN SDC DarwinDXNDarwinColocationNot disclosed
NEXTDC D1 DarwinNEXTDCDarwinColocation1 MW IT capacity (3,000 m² technical space) IT load

Data centre operators in Northern Territory

Area9 (1), DCI Data Centers (1), DXN (1), NEXTDC (1)

Number of data centre facilities per operator in this state.

Other states and territories

Australian data centre pipeline summary → · Operators & owners →

Figures are generated from the DC Info directory (last updated 17 November 2026). Capacity is shown as published, with its basis. Coverage is not a complete census. Spotted a change? Let us know. See methodology.