Data Centre Capacity Definitions
Data centre capacity is published on different bases, so the same site can be described as 150 MW, 225 MW or 300 MVA depending on what is being measured. DC Info shows each figure as published and labels its basis, so you can see what each number measures.
The bases we use
- IT load (IT MW)
- Power available to the IT equipment – servers, storage and network. This is the figure operators usually quote for sellable capacity. Facility power is higher because it also covers cooling and other plant.
- Total facility (total MW)
- The site’s total power draw or consumption, including cooling, lighting and losses. Planning documents often state this figure.
- Grid connection (MVA or MW)
- The size of the electricity connection or substation. MVA (megavolt-amperes) measures apparent power at the connection; it is not the same as the data centre’s IT or total load, so figures given only in MVA are not added to MW totals.
- Generation
- On-site or co-located power generation (for example a gas or solar plant feeding a precinct). It is not data centre load; where it is the only figure published for a project, it is included in the indicative total as published.
- Basis not stated
- A MW figure was published without saying whether it is IT load or total power. It is included in the indicative total as published.
- Not disclosed
- No capacity figure has been published.
How the headline totals are calculated
The headline capacity total adds the MW figure published for each project, whatever its basis. Ranges use the upper figure as published (“up to”). Figures published only in MVA are not added. Because bases differ, the total is an indicative scale of the published pipeline, not a measure of IT load.
Across all 121 project records, 92 publish a MW figure, together about 32.11 GW. By stage: under construction 2.96 GW; planning 25.67 GW; operational / expansion 1.27 GW; approved 2.20 GW.
| Basis | Meaning | Summed? | Projects | Facilities |
|---|---|---|---|---|
| IT load | power available to the IT equipment (servers, storage, network). | Yes | 39 | 31 |
| Total facility | the site's total power draw or consumption, including cooling and other plant. | Yes | 13 | 10 |
| Grid connection | the size of the electricity connection or substation (often in MVA); not the data centre's IT or total load. | Only when given in MW | 3 | 2 |
| Generation | on-site power generation capacity; not data centre load. | Yes | 1 | 0 |
| Basis not stated | a MW figure was published without saying whether it is IT load or total power. | Yes | 44 | 7 |
| Not disclosed | no capacity figure has been published. | — | 21 | 135 |
Check the basis label on each record before comparing two projects: an IT-load figure and a total-facility or grid figure for the same site can differ substantially.