Data Centres in Tasmania (Hobart)

As of 17 November 2026, DC Info lists 4 data centre projects in Tasmania (1 under construction, 3 planning). 3 of 4 projects publish a capacity figure in MW, together about 424 MW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 4 data centre facilities in Tasmania, run by 3 operators.

Search TAS projects Search TAS facilities

Largest TAS data centre projects by published capacity

Largest TAS data centre projects
ProjectOwner / operatorLocationStageCapacity
Firmus Bell Bay AI FactoryFirmus TechnologiesLong ReachPlanning~288 MW Total facility
Firmus AI Factory Launceston (Project Southgate – St Leonards)Firmus TechnologiesSt LeonardsUnder construction90 MW Basis not stated
Firmus Wesley Vale AI FactoryFirmus TechnologiesWesley ValePlanningUp to 46 MW IT load

Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.

All 4 projects in Tasmania

TAS data centre projects
ProjectOwner / operatorLocationStageCapacity (as published, with basis)
Firmus AI Factory Launceston (Project Southgate – St Leonards)Firmus TechnologiesSt LeonardsUnder construction90 MW Basis not stated
Energy Estate Digital Bell Bay hubEnergy Estate Digital / H2UBell BayPlanningNot disclosed
Firmus Bell Bay AI FactoryFirmus TechnologiesLong ReachPlanning~288 MW Total facility
Firmus Wesley Vale AI FactoryFirmus TechnologiesWesley ValePlanningUp to 46 MW IT load

Data centre facilities in Tasmania (4)

Data centre facilities in TAS
FacilityOperatorSuburb / areaTypeCapacity (as published)
42-24 Cambridge Data Centre42-24CambridgeColocationNot disclosed
42-24 Derwent Park Data Centre42-24Derwent ParkColocationRacks 3–21 kW; 650 kVA backup generators
DXN TAS01 HobartDXNHobartColocationNot disclosed
Vocus Hobart Data CentreVocusHobartColocationNot disclosed

Data centre operators in Tasmania

42-24 (2), DXN (1), Vocus (1)

Number of data centre facilities per operator in this state.