State guide · Updated 17 November 2026
Data Centres in Queensland (Brisbane)
As of 17 November 2026, DC Info lists 9 data centre projects in Queensland (1 under construction, 6 planning, 1 operational / expansion, 1 other). 6 of 9 projects publish a capacity figure in MW, together about 1.98 GW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 29 data centre facilities in Queensland, run by 18 operators.
Largest QLD data centre projects by published capacity
| Project | Owner / operator | Location | Stage | Capacity |
|---|---|---|---|---|
| Western Downs Digital Park | Zerra DC (with Australian Data Centres and Macquarie Capital) | Kogan | Planning | Up to 1.44 GW IT load |
| Quinbrook Supernode data centre precinct | Quinbrook Infrastructure Partners | Brendale | Planning | 500 MW IT load |
| DigiCo BNE3 Brisbane Airport | DigiCo Infrastructure REIT | Brisbane Airport | Planning | 19.6 MW IT load |
| NEXTDC B2 Brisbane – Stage 2 | NEXTDC | Fortitude Valley | Operational / expansion | 12 MW IT load |
| NEXTDC SC2 Sunshine Coast | NEXTDC | Maroochydore | Under construction | 6 MW IT load |
| NEXTDC GC1 Gold Coast | NEXTDC | Southport | Planning | 6 MW IT load |
Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.
All 9 projects in Queensland
| Project | Owner / operator | Location | Stage | Capacity (as published, with basis) |
|---|---|---|---|---|
| NEXTDC SC2 Sunshine Coast | NEXTDC | Maroochydore | Under construction | 6 MW IT load |
| DigiCo BNE3 Brisbane Airport | DigiCo Infrastructure REIT | Brisbane Airport | Planning | 19.6 MW IT load |
| Latan Data Centre & Renewable Energy Project | Australian Energy and Water Corporation | near Charters Towers | Planning | 100 MW target (reported) Basis not stated |
| NEXTDC GC1 Gold Coast | NEXTDC | Southport | Planning | 6 MW IT load |
| Quinbrook Supernode data centre precinct | Quinbrook Infrastructure Partners | Brendale | Planning | 500 MW IT load |
| Swanbank data centre (Leaf Street) | Northern Concept Swanb Pty Ltd | Swanbank | Planning | Not stated (about 82,576 m² GFA reported) Basis not stated |
| Western Downs Digital Park | Zerra DC (with Australian Data Centres and Macquarie Capital) | Kogan | Planning | Up to 1.44 GW IT load |
| NEXTDC B2 Brisbane – Stage 2 | NEXTDC | Fortitude Valley | Operational / expansion | 12 MW IT load |
| edgeDC The Pinnacle | edgeDC | North Lakes | Other | Not disclosed |
Data centre facilities in Queensland (29)
| Facility | Operator | Suburb / area | Type | Capacity (as published) |
|---|---|---|---|---|
| 5G Networks Brisbane Data Centre | 5G Networks | Fortitude Valley | Colocation | Not disclosed |
| Brennan Brisbane Data Centre | Brennan | Fortitude Valley | Colocation | Not disclosed |
| Wellcamp Data Centre | Centuria Industrial REIT | Wellcamp | Colocation | Current capacity of up to 2.5 MW Basis not stated |
| Dataspace Eight Mile Plains Data Centre | Dataspace | Eight Mile Plains | Colocation | 2 MW IT load (810 m²) IT load |
| DigiCo BNE Brisbane CBD | DigiCo Infrastructure REIT | Brisbane | Colocation | 0.3 MW installed IT capacity; approximately 243 m² NLA IT load |
| DigiCo BNE1 Brisbane | DigiCo Infrastructure REIT | Brisbane Airport | Colocation | 1.8 MW installed IT capacity; approximately 900 m² NLA on 3,567 m² of land IT load |
| DigiCo BNE2 Brisbane | DigiCo Infrastructure REIT | Brisbane Airport | Colocation | 1.7 MW installed IT capacity; approximately 1,232 m² NLA IT load |
| DigiCo TSV1 Townsville | DigiCo Infrastructure REIT | Townsville | Colocation | 0.5 MW installed IT capacity; approximately 285 m² NLA IT load |
| DSColo Kenmore Data Centre | Digital Sense | Kenmore | Colocation | Not disclosed |
| Equinix BR1 | Equinix | Fortitude Valley | Colocation | Not disclosed |
| Host Networks Eight Mile Plains | Host Networks | Eight Mile Plains | Colocation | Not disclosed |
| Interactive Brisbane Data Centre | Interactive | Eight Mile Plains | Colocation | Standard 2–7 kW per rack; high density up to 100 kW per rack |
| NEXTDC B1 Brisbane | NEXTDC | Brisbane | Colocation | 2.25 MW IT capacity (1,650 m² technical space) IT load |
| NEXTDC B2 Brisbane | NEXTDC | Fortitude Valley | Colocation | 12 MW IT capacity (6,000 m² technical space) IT load |
| NEXTDC SC1 Sunshine Coast | NEXTDC | Maroochydore | Edge | 1 MW IT capacity (290 m² technical space) IT load |
| ONQ Cairns Edge Node | ONQ Communications | Cairns | Edge | Not disclosed |
| ONQ Mackay Edge Node | ONQ Communications | Mackay | Edge | Not disclosed |
| ONQ Townsville Edge Node | ONQ Communications | Townsville | Edge | Not disclosed |
| OntheNet Gold Coast Data Centre 1 | OntheNet | Gold Coast | Colocation | Not disclosed |
| OntheNet Gold Coast Data Centre 2 | OntheNet | Gold Coast | Colocation | Up to 6 kW per rack |
| Over the Wire 360 St Pauls Terrace | Over the Wire | Fortitude Valley | Colocation | Not disclosed |
| Over the Wire Little Edward Street | Over the Wire | Spring Hill | Colocation | Not disclosed |
| Polaris Data Centre | Polaris Data Centre | Springfield Central | Colocation | Over 14,500 m² across five levels; over 7,000 m² raised technical floor |
| ServersAustralia Brisbane | Servers Australia | East Brisbane | Colocation | Not disclosed |
| T1-Colo Sunshine Coast | T1-Colo | Sunshine Coast | Colocation | Not disclosed |
| Telstra InfraCo Woolloongabba Data Centre | Telstra InfraCo | Woolloongabba | Colocation | Not disclosed |
| Vocus Brisbane Creek Street | Vocus | Brisbane | Colocation | Not disclosed |
| Vocus Brisbane Eagle Street | Vocus | Brisbane | Colocation | Not disclosed |
| Vocus Fortitude Valley Data Centre | Vocus | Fortitude Valley | Colocation | Not disclosed |
Data centre operators in Queensland
DigiCo Infrastructure REIT (4), NEXTDC (3), ONQ Communications (3), Vocus (3), OntheNet (2), Over the Wire (2), 5G Networks (1), Brennan (1), Centuria Industrial REIT (1), Dataspace (1), Digital Sense (1), Equinix (1), Host Networks (1), Interactive (1), Polaris Data Centre (1), Servers Australia (1), T1-Colo (1), Telstra InfraCo (1)
Number of data centre facilities per operator in this state.
Other states and territories
- New South Wales (Sydney)
- Victoria (Melbourne)
- Queensland (Brisbane)
- Western Australia (Perth)
- South Australia (Adelaide)
- Australian Capital Territory (Canberra)
- Northern Territory (Darwin)
- Tasmania (Hobart)
Australian data centre pipeline summary → · Operators & owners →
Figures are generated from the DC Info directory (last updated 17 November 2026). Capacity is shown as published, with its basis. Coverage is not a complete census. Spotted a change? Let us know. See methodology.