ColocationQLD
Dataspace Eight Mile Plains Data Centre
Dataspace · Eight Mile Plains, Queensland
The header graphic is a stylised illustration, not a photograph of this facility.
Key facts
- Operator
- Dataspace
- Location
- Eight Mile Plains, Queensland (QLD)
- Status
- Operational
- Type
- Colocation
- Capacity (as published)
- 2 MW IT load (810 m²) IT load
- IT capacity
- 2 MW
- Floor area
- 810 m²
- Density
- —
- Tier / certification
- NABERS 3.5*
- Opened
- —
- Builder / head contractor
- —
- Named contractors by trade
- —
- Named suppliers
- —
- Notes
- Previously operated by Fujitsu as the Fujitsu Eight Mile Plains Data Centre. Fujitsu's Asia-Pacific data-centres page placed the site 17 km from the Brisbane CBD. Dataspace (owned by Next Capital, which acquired Fujitsu's Australian data centre business in July 2026) listed this site among its five facilities when it launched on 17 November 2026 (Greystanes and Homebush in Sydney, Noble Park in Melbourne, Malaga in Perth, and Eight Mile Plains in Brisbane).
- Sources
- Original source links: available to members — request via contact
- Last updated
- 2026-11-17
Updated regularly. Spotted a change? Let us know. Original source links: available to members — request via contact. How we verify.
Suggest an update to this facility
Other facilities in Queensland
- NEXTDC B2 BrisbaneFortitude Valley · 12 MW IT capacity (6,000 m² technical space) (IT load)
- Wellcamp Data CentreWellcamp · Current capacity of up to 2.5 MW (Basis not stated)
- NEXTDC B1 BrisbaneBrisbane · 2.25 MW IT capacity (1,650 m² technical space) (IT load)
- DigiCo BNE1 BrisbaneBrisbane Airport · 1.8 MW installed IT capacity; approximately 900 m² NLA on 3,567 m² of land (IT load)
- DigiCo BNE2 BrisbaneBrisbane Airport · 1.7 MW installed IT capacity; approximately 1,232 m² NLA (IT load)
- NEXTDC SC1 Sunshine CoastMaroochydore · 1 MW IT capacity (290 m² technical space) (IT load)
- DigiCo TSV1 TownsvilleTownsville · 0.5 MW installed IT capacity; approximately 285 m² NLA (IT load)
- DigiCo BNE Brisbane CBDBrisbane · 0.3 MW installed IT capacity; approximately 243 m² NLA (IT load)
- 5G Networks Brisbane Data CentreFortitude Valley
- Brennan Brisbane Data CentreFortitude Valley
- DSColo Kenmore Data CentreKenmore
- Equinix BR1Fortitude Valley