DC Info

State guide · Updated 17 November 2026

Data Centres in the ACT (Canberra)

As of 17 November 2026, DC Info lists 6 data centre projects in Australian Capital Territory (1 under construction, 1 approved, 1 planning, 3 operational / expansion). 6 of 6 projects publish a capacity figure in MW, together about 816 MW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 12 data centre facilities in Australian Capital Territory, run by 8 operators.

Search ACT projects Search ACT facilities

Largest ACT data centre projects by published capacity

Largest ACT data centre projects
ProjectOwner / operatorLocationStageCapacity
CDC Hume Campus 3CDC Data CentresHumePlanning576 MW Basis not stated
CDC Beard 2 (Jerrabomberra Stage 2)CDC Data CentresBeardApproved84 MW Basis not stated
CDC Hume Campus Two (HU4–HU5)CDC Data CentresHumeOperational / expansion51 MW Basis not stated
CDC Fyshwick campus (FY1–FY2)CDC Data CentresFyshwickOperational / expansion45 MW Basis not stated
CDC Beard 1 (BE1 / Jerrabomberra Stage 1)CDC Data CentresBeardUnder construction39 MW Total facility
CDC Hume Campus One (HU1–HU3)CDC Data CentresHumeOperational / expansion21 MW Basis not stated

Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.

All 6 projects in Australian Capital Territory

ACT data centre projects
ProjectOwner / operatorLocationStageCapacity (as published, with basis)
CDC Beard 1 (BE1 / Jerrabomberra Stage 1)CDC Data CentresBeardUnder construction39 MW Total facility
CDC Beard 2 (Jerrabomberra Stage 2)CDC Data CentresBeardApproved84 MW Basis not stated
CDC Hume Campus 3CDC Data CentresHumePlanning576 MW Basis not stated
CDC Fyshwick campus (FY1–FY2)CDC Data CentresFyshwickOperational / expansion45 MW Basis not stated
CDC Hume Campus One (HU1–HU3)CDC Data CentresHumeOperational / expansion21 MW Basis not stated
CDC Hume Campus Two (HU4–HU5)CDC Data CentresHumeOperational / expansion51 MW Basis not stated

Data centre facilities in Australian Capital Territory (12)

Data centre facilities in ACT
FacilityOperatorSuburb / areaTypeCapacity (as published)
ADC Fyshwick Data CentreAustralian Data CentresFyshwickColocationNot disclosed
ADC Mitchell Data CentreAustralian Data CentresMitchellColocation3,000 m² technical space; 7 MVA onsite high-voltage supply Grid connection
CDC Fyshwick CampusCDC Data CentresFyshwickColocation45 MW current capacity (operating) Basis not stated
CDC Hume Campus OneCDC Data CentresHumeColocation21 MW current capacity (operating) Basis not stated
CDC Hume Campus TwoCDC Data CentresHumeColocation51 MW current capacity (operating) Basis not stated
Equinix CA1EquinixMitchellColocationNot disclosed
Macquarie Data Centres IC4 CanberraMacquarie Data CentresCanberraColocationUndisclosed (Macquarie states Canberra campus capacity is undisclosed for security purposes)
Macquarie Data Centres IC5 CanberraMacquarie Data CentresCanberraColocationUndisclosed (Macquarie states Canberra campus capacity is undisclosed for security purposes)
NEXTDC C1 CanberraNEXTDCBruceColocation4.4 MW IT capacity (2,260 m² technical space) IT load
STACK CAN01A HumeSTACK InfrastructureHumeColocationNot disclosed
Telstra InfraCo Deakin Data CentreTelstra InfraCoDeakinColocationNot disclosed
Vocus TransACT HouseVocusDicksonColocationNot disclosed

Data centre operators in Australian Capital Territory

CDC Data Centres (3), Australian Data Centres (2), Macquarie Data Centres (2), Equinix (1), NEXTDC (1), STACK Infrastructure (1), Telstra InfraCo (1), Vocus (1)

Number of data centre facilities per operator in this state.

Other states and territories

Australian data centre pipeline summary → · Operators & owners →

Figures are generated from the DC Info directory (last updated 17 November 2026). Capacity is shown as published, with its basis. Coverage is not a complete census. Spotted a change? Let us know. See methodology.