State guide · Updated 17 November 2026
Data Centres in the ACT (Canberra)
As of 17 November 2026, DC Info lists 6 data centre projects in Australian Capital Territory (1 under construction, 1 approved, 1 planning, 3 operational / expansion). 6 of 6 projects publish a capacity figure in MW, together about 816 MW as published. Bases differ (IT load, total facility, grid connection, generation), so treat this as an indicative scale; each record shows its basis (capacity definitions). The directory also lists 12 data centre facilities in Australian Capital Territory, run by 8 operators.
Largest ACT data centre projects by published capacity
| Project | Owner / operator | Location | Stage | Capacity |
|---|---|---|---|---|
| CDC Hume Campus 3 | CDC Data Centres | Hume | Planning | 576 MW Basis not stated |
| CDC Beard 2 (Jerrabomberra Stage 2) | CDC Data Centres | Beard | Approved | 84 MW Basis not stated |
| CDC Hume Campus Two (HU4–HU5) | CDC Data Centres | Hume | Operational / expansion | 51 MW Basis not stated |
| CDC Fyshwick campus (FY1–FY2) | CDC Data Centres | Fyshwick | Operational / expansion | 45 MW Basis not stated |
| CDC Beard 1 (BE1 / Jerrabomberra Stage 1) | CDC Data Centres | Beard | Under construction | 39 MW Total facility |
| CDC Hume Campus One (HU1–HU3) | CDC Data Centres | Hume | Operational / expansion | 21 MW Basis not stated |
Ranked by the published MW figure; bases differ (shown next to each figure). See capacity definitions.
All 6 projects in Australian Capital Territory
| Project | Owner / operator | Location | Stage | Capacity (as published, with basis) |
|---|---|---|---|---|
| CDC Beard 1 (BE1 / Jerrabomberra Stage 1) | CDC Data Centres | Beard | Under construction | 39 MW Total facility |
| CDC Beard 2 (Jerrabomberra Stage 2) | CDC Data Centres | Beard | Approved | 84 MW Basis not stated |
| CDC Hume Campus 3 | CDC Data Centres | Hume | Planning | 576 MW Basis not stated |
| CDC Fyshwick campus (FY1–FY2) | CDC Data Centres | Fyshwick | Operational / expansion | 45 MW Basis not stated |
| CDC Hume Campus One (HU1–HU3) | CDC Data Centres | Hume | Operational / expansion | 21 MW Basis not stated |
| CDC Hume Campus Two (HU4–HU5) | CDC Data Centres | Hume | Operational / expansion | 51 MW Basis not stated |
Data centre facilities in Australian Capital Territory (12)
| Facility | Operator | Suburb / area | Type | Capacity (as published) |
|---|---|---|---|---|
| ADC Fyshwick Data Centre | Australian Data Centres | Fyshwick | Colocation | Not disclosed |
| ADC Mitchell Data Centre | Australian Data Centres | Mitchell | Colocation | 3,000 m² technical space; 7 MVA onsite high-voltage supply Grid connection |
| CDC Fyshwick Campus | CDC Data Centres | Fyshwick | Colocation | 45 MW current capacity (operating) Basis not stated |
| CDC Hume Campus One | CDC Data Centres | Hume | Colocation | 21 MW current capacity (operating) Basis not stated |
| CDC Hume Campus Two | CDC Data Centres | Hume | Colocation | 51 MW current capacity (operating) Basis not stated |
| Equinix CA1 | Equinix | Mitchell | Colocation | Not disclosed |
| Macquarie Data Centres IC4 Canberra | Macquarie Data Centres | Canberra | Colocation | Undisclosed (Macquarie states Canberra campus capacity is undisclosed for security purposes) |
| Macquarie Data Centres IC5 Canberra | Macquarie Data Centres | Canberra | Colocation | Undisclosed (Macquarie states Canberra campus capacity is undisclosed for security purposes) |
| NEXTDC C1 Canberra | NEXTDC | Bruce | Colocation | 4.4 MW IT capacity (2,260 m² technical space) IT load |
| STACK CAN01A Hume | STACK Infrastructure | Hume | Colocation | Not disclosed |
| Telstra InfraCo Deakin Data Centre | Telstra InfraCo | Deakin | Colocation | Not disclosed |
| Vocus TransACT House | Vocus | Dickson | Colocation | Not disclosed |
Data centre operators in Australian Capital Territory
CDC Data Centres (3), Australian Data Centres (2), Macquarie Data Centres (2), Equinix (1), NEXTDC (1), STACK Infrastructure (1), Telstra InfraCo (1), Vocus (1)
Number of data centre facilities per operator in this state.
Other states and territories
- New South Wales (Sydney)
- Victoria (Melbourne)
- Queensland (Brisbane)
- Western Australia (Perth)
- South Australia (Adelaide)
- Australian Capital Territory (Canberra)
- Northern Territory (Darwin)
- Tasmania (Hobart)
Australian data centre pipeline summary → · Operators & owners →
Figures are generated from the DC Info directory (last updated 17 November 2026). Capacity is shown as published, with its basis. Coverage is not a complete census. Spotted a change? Let us know. See methodology.