CDC Hume Campus One
CDC Data Centres · Hume, Australian Capital Territory
The header graphic is a stylised illustration, not a photograph of this facility.
Key facts
- Operator
- CDC Data Centres
- Location
- Hume, Australian Capital Territory (ACT)
- Status
- Operational
- Type
- Colocation
- Capacity (as published)
- 21 MW current capacity (operating)
- Tier / certification
- —
- Opened
- 2008
- Builder / head contractor
- —
- Named contractors by trade
- Sainsbury – mechanical services (precision cooling, closed-loop systems), directly engaged by CDC Mechanical
- Named suppliers
- —
- Notes
- CDC states this campus is home to three data centres, including CDC’s first (HU1), which opened in 2008. The 21 MW figure is the published current operating capacity for the campus, not a per-building split. Beard Campus is under construction and is not included.
- Sources
- Available to members — become a member
- Last updated
- 2026-11-14
Updated regularly. Spotted a change? Let us know. Source citations are available to members — become a member.
Suggest an update to this facility
Other facilities in Australian Capital Territory
- CDC Hume Campus Two Hume · 51 MW
- CDC Fyshwick Campus Fyshwick · 45 MW
- NEXTDC C1 Canberra Bruce · 4.4 MW
- ADC Fyshwick Data Centre Fyshwick
- ADC Mitchell Data Centre Mitchell
- Equinix CA1 Mitchell
- Macquarie Data Centres IC4 Canberra Canberra
- Macquarie Data Centres IC5 Canberra Canberra
- Telstra InfraCo Deakin Data Centre Deakin