Key facts
- Owner / operator
- Princeton Digital Group
- Location
- Yarraville, Victoria (VIC)
- Stage
- PlanningPlanning (reported acquisition)
- Planning application
- —
- Capacity (as published)
- 250–300 MW (reported) Basis not stated
- Expected start
- —
- Expected completion
- —
- Investment value
- —
- Builder / head contractor
- —
- Named contractors by trade
- —
- Named suppliers
- —
- Tender / procurement status
- —
- Notes
- Reported as a 250–300 MW site at Yarraville, to be built in two stages. Richmond Bridge is reported to hold the site for UniSuper. Princeton Digital Group was reported in October 2026 to be in exclusive talks to acquire it for about A$300 million, and to assume leasing risk under a long-term lease with ESR. The acquisition and development have not been confirmed by the companies. This is a separate lead from Princeton Digital Group's Project Genesis in Campbelltown, NSW, and from the Microsoft Cawley Road campus in Brooklyn / Yarraville.Capacity detail: 250–300 MW site capacity, two stages (reported). No published basis (IT load or total facility).
- Sources
- Original source links: available to members — request via contact
- Last updated
- 2026-11-17
Updated regularly. Spotted a change? Let us know. Original source links: available to members — request via contact. How we verify.
Suggest an update to this project
Other projects in Victoria
- Victorian AI HubPlumpton · Up to 2.4 GW (Basis not stated)
- NEXTDC M5 MelbourneMelbourne · ~1.2 GW (Total facility)
- STACK MEL03 TarneitMelbourne · 864 MW (Basis not stated)
- Keppel Morwell AI data centre campusMorwell · 720 MW (Total facility)
- Casey Data ParkClyde North · 488 MW (IT load)
- CDC Laverton campus (LA1–LA3)Laverton North · 400+ MW (Basis not stated)
- HyperDC MBL1Moorabool · 400 MW (IT load)
- AirTrunk MEL2Tullamarine · 354+ MW (Basis not stated)
- CDC Brooklyn campus (BK1–BK3)Brooklyn · 350+ MW (Basis not stated)
- Zerra DC Campbellfield ('Project Dune')Campbellfield · 336 MW (Total facility)
- STACK MEL02Truganina · 252 MW (IT load)
- Stockland Cherry Lane, Laverton NorthLaverton North · 250 MW (Basis not stated)
- GreenSquareDC Spotswood (MEL1)Spotswood · 240 MW (Basis not stated)
All 40 projects in VIC → · 31 data centre facilities in VIC →
Unverified – needs further confirmation. Reported in The Australian Financial Review's Street Talk column (11 October 2026) citing anonymous sources; not confirmed by Princeton Digital Group. This record is a lead we have not yet confirmed with the owner; details may be incomplete or out of date. Help us confirm it.