ApprovedVIC
STACK MEL03 Tarneit
STACK Infrastructure · Melbourne (suburb not named in the NRW/Fredon announcements), Victoria
The header graphic is a stylised illustration, not a photograph of this project.
Key facts
- Owner / operator
- STACK Infrastructure
- Location
- Melbourne (suburb not named in the NRW/Fredon announcements), Victoria (VIC)
- Stage
- ApprovedApproved (first-stage mechanical fabrication commenced Sep 2026)
- Capacity (as published)
- 864 MW hyperscale campus (NRW Holdings / Fredon ASX announcement, 24 Sep 2026). The first-stage mechanical package is described as supporting 432 MW of that campus.
- Expected start
- —
- Expected completion
- First-stage mechanical package scheduled for completion March 2028; overall mechanical package completion scheduled for 2028 (NRW/Fredon)
- Investment value
- First-stage mechanical package about A$115 million, part of a broader mechanical package of about A$300 million for which Fredon was selected as preferred contractor (NRW ASX, 24 Sep 2026)
- Builder / head contractor
- —
- Named contractors by trade
- Fredon – Preferred Contractor, D&C mechanical; stage 1 ~A$115m off-site fabrication (Sep 2026–Mar 2028) for 432MW; ~A$300m total package Mechanical
As published: Fredon – Preferred Contractor, D&C mechanical; stage 1 ~A$115m off-site fabrication (Sep 2026–Mar 2028) for 432MW; ~A$300m total package- Named suppliers
- —
- Tender / procurement status
- —
- Notes
- NRW Holdings announced on 24 September 2026 that its subsidiary Fredon had been awarded the first-stage design-and-construct mechanical scope for Stack Data Centre MEL03 in Melbourne, with off-site fabrication commencing in September 2026. That announcement does not itself state a street address or the planning-permit status. A suburban location of Tarneit is widely reported for MEL03; it is not named in the ASX text, so treat the suburb as reported rather than as a figure published in that announcement. Head contractor for the overall building is not named in the ASX release (Fredon is the mechanical contractor).
- Sources
- Available to members — become a member
- Last updated
- 2026-11-13
Updated regularly. Spotted a change? Let us know. Source citations are available to members — become a member.
Suggest an update to this project
Other projects in Victoria
- Victorian AI Hub Plumpton · 2.4 GW
- NEXTDC M5 Melbourne Melbourne · 1.2 GW
- Keppel Morwell AI data centre campus Morwell · 720 MW
- Casey Data Park Clyde North · 488 MW
- CDC Laverton campus (LA1–LA3) Laverton North · 400 MW
- HyperDC MBL1 Moorabool · 400 MW
- AirTrunk MEL2 Melbourne north-west · 354 MW
- CDC Brooklyn campus (BK1–BK3) Brooklyn · 350 MW
- Zerra DC Campbellfield ('Project Dune') Campbellfield · 336 MW
- STACK MEL02 Truganina · 252 MW
- Stockland Cherry Lane, Laverton North Laverton North · 250 MW
- GreenSquareDC Spotswood (MEL1) Spotswood · 240 MW