ColocationNSW
Swoop Newcastle West
UnverifiedSwoop · Newcastle West, New South Wales
The header graphic is a stylised illustration, not a photograph of this facility.
Key facts
- Operator
- Swoop
- Location
- Newcastle West, New South Wales (NSW)
- Status
- Reported as operational (not confirmed)
- Type
- Colocation
- Capacity (as published)
- Not disclosed
- IT capacity
- —
- Floor area
- —
- Density
- —
- Tier / certification
- —
- Opened
- —
- Builder / head contractor
- —
- Named contractors by trade
- —
- Named suppliers
- —
- Notes
- Listed in third-party data centre directories; not yet confirmed on the operator’s own website.
- Sources
- Original source links: available to members — request via contact
- Last updated
- 2026-11-15
Updated regularly. Spotted a change? Let us know. Original source links: available to members — request via contact. How we verify.
Suggest an update to this facility
Other facilities in New South Wales
- AirTrunk SYD3 Sydney WestSydney West · 400+ MW total capacity (published campus figure) (Total facility)
- CDC Eastern Creek CampusEastern Creek · Over 200 MW of capacity (campus figure as published) (Basis not stated)
- AirTrunk SYD2 Sydney NorthLane Cove West · 180+ MW total capacity (published campus figure; more than 180 MW at full build-out) (Total facility)
- AirTrunk SYD1 Sydney WestSydney West · 130+ MW total capacity (published campus figure) (Total facility)
- Dataspace Greystanes Data CentreGreystanes · 92 MW IT load (24,000 m² technical data hall area) (IT load)
- NEXTDC S3 SydneyArtarmon · 80 MW IT capacity (20,000 m² technical space) (IT load)
- NEXTDC S2 SydneyMacquarie Park · 30 MW IT capacity (8,700 m² technical space) (IT load)
- NEXTDC S1 SydneyMacquarie Park · 16 MW IT capacity (5,800 m² technical space) (IT load)
- NEXTDC S6 SydneyArtarmon · 13.5 MW target IT capacity (4,000 m² technical space) (IT load)
- Fujitsu North Ryde Data CentreNorth Ryde · 4.8 MW IT load (3,600 m²) (IT load)
- Dataspace Homebush Data CentreHomebush · 3 MW IT load (3,500 m²) (IT load)
- Macquarie Data Centres IC1 Sydney CBDSydney · 2 MW total load capacity / IT load (campus figure published for the Sydney CBD campus, which comprises IC1); 1,330 m² technical area (IT load)
- Leading Edge NTL1 NewcastleNewcastle · Total site capacity 1.5 MW (1,160 m² available) (Total facility)
Unverified – needs further confirmation. Operator website did not list this site as at 14–15 November 2026. This record is a lead we have not yet confirmed with the operator; details may be incomplete or out of date. Help us confirm it.